Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-34_351
REMOVAL-cont. - TM-9-2350-277-34_354
TM-9-2350-277-34 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
289
290
291
292
293
294
295
296
297
298
299
TM 9-2350-277-34
REPAIR HOPPER HATCH HINGE (M58 ONLY)
0049 00
THIS WORK PACKAGE COVERS:
Removal (page 0049 00-1).
Installation (page 0049 00-3).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
Metal Worker’s Tool Kit (WP 0120 00, Item 63)
Trailer Mounted Welding Shop (WP 0120 00, Item 69)
Sander Spindle Adapter (WP 0120 00, Item 1)
Welder’s Gloves (WP 0120 00, Item 18)
Industrial Goggles (WP 0120 00, Item 19)
Welder’s Helmet (WP 0120 00, Item 21)
Electric Disc Sander (WP 0120 00, Item 46)
Arc Welding Machine (WP 0120 00, Item 68)
Materials/Parts
Welding electrode (WP 0122 00, Item 35)
P
ersonnel
Required
Metal Worker 44B10
References
See your -20
TM 43-0139
TM 9-237
Equipment Condition
Hopper hatch removed from carrier (see your -20)
REMOVAL
WARNING
Metal chips and grinding dust can cause injury. Wear goggles and gloves.
1.
Remove and discard broken hinge (1) or (2) from hatch (3).
2.
Use a machinist hammer and a cold chisel to chip off remaining part of bad hinge (1) or (2) from hatch (3).
0049 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business