Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-6_326
REMOVAL - TM-9-2350-277-20-6_328
TM-9-2350-277-20-6 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
246
247
248
249
250
251
252
253
254
255
256
TM 9-2350-277-20-6
REPLACE STE/ICE ENGINE WIRING HARNESS
0882 00
THIS WORK PACKAGE COVERS:
Removal (page 0882 00-1).
Inspection (page 0882 00-4).
Repair (page 0882 00-5).
Installation (page 0882 00-5).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Multimeter
(WP 0926 00, Item 30)
M
aterials/Parts
Lockwasher (4)
Strap
Strap (3)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Power plant removed (WP 0156 00)
REMOVAL
1.
Remove nut (1), lockwasher (2), and two ground leads (3) from
generator
. Discard lockwasher.
2.
Disconnect leads (4) from
generator
main cable (5).
0882 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business