TM 9-2350-277-20-6
REPLACE STE/ICE CREW WIRING HARNESS (M1064A3 ONLY) Continued
0881 00
6.
Install leads 772 (16), 778 (17), 48 (18), 6 (19), and 6P (20) on battery terminal (21). Secure with screw (22) and nut (23).
7.
Install lead 779 (24) and battery ground lead (25) on battery terminal (21). Secure with screw (22) and nut (23).
FOLLOW-THROUGH STEPS
1.
Push battery draw in (see your -10).
2.
Install shunt leads (WP 0873 00).
3.
Close power plant front access door (see your -10).
END OF TASK
0881 00-6