Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-5_782
REPLACE M14 NBC CABLES AND SWITCH ASSEMBLY (M1059A3 ONLY)
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
654
655
656
657
658
659
660
661
662
663
664
TM 9-2350-277-20-5
REPLACE M13 NBC HEATERS (M1068A3 ONLY) — Continued
0798 00
15. Install circuit lead 537A (17) on heater (10).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0338 00).
2.
Check air flow of NBC system. Follow procedures in TM 3-6680-316-10.
END OF TASK
0798 00-5/6 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business