TM 9-2350-277-20-5REPLACE FRONT ARMOR (M113A3 ONLY) — Continued 0749 004. Raise power plant door (1) 120 to 130 degrees from closed position.5. Attach lifting device to door lifting eye (2).6. Remove four screws (3), washers (4), and door armor plate (5) from power plant door (1).7. Remove two screws (6), washers (7), and lockwashers (8) from housing (9). Discard lockwashers.8. Rotate housing (9) toward bottom of carrier (clockwise), until second set of screw holes are aligned.9. Reinstall two screws (6) and washers (7) on housing (9). Detach lifting device and lower door (1).0749 00-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business