TM 9-2350-277-20-4
REPLACE POWER PLANT DOOR (M113A3 ONLY)
0470 00
THIS WORK PACKAGE COVERS:
Removal (page 0470 00-1)
Installation (page 0470 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Torque Wrench (WP 0926 00, Item 83)
Sling (Endless) (WP 0926 00, Item 47)
Suitable Lifting Device
Personnel Required
Unit Mechanic
Helper (H)
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Trim vane lowered and disconnected (see your -10)
Power plant door open (see your -10)
REMOVAL
WARNING
Power plant door is heavy. It can fall and injure you. Do not remove housing before relieving
spring tension by lifting and holding with lifting device.
Damaged lifting slings can fail with load. Soldiers can be killed or injured. Inspect all slings
before use. Do not use damaged slings.
1.
Connect a suitable lifting device and sling around power plant door. Raise power plant door until tension is released on
tension springs.
0470 00-1