Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-3_459
REMOVAL - TM-9-2350-277-20-3_462
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
371
372
373
374
375
376
377
378
379
380
381
TM 9-2350-277-20-3
REPAIR BATTERY BOX (RIGHT SIDE) (M1064A3)
0354 00
THIS WORK PACKAGE COVERS:
Removal (page 0354 00-1).
Cleaning and Inspection (page 0354 00-2).
Installation (page 0354 00-3).
INITIAL SETUP:
Maintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Torque
Wrench (WP 0926 00, Item 83)
M
aterials/Parts
Bituminous coating compound (WP 0928 00, Item 13)
Epoxy coating kit (WP 0928 00, Item 30)
Sodium bicarbonate (WP 0928 00, Item 60)
Locknut (4)
Lockwasher (4)
Mount (4)
P
ersonnel
Required
Unit Mechanic 63T10
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery box cover/seat removed (see your -10)
Battery leads removed (WP 0344 00)
Batteries and retainers removed (WP 0349 00)
REMOVAL
1.
Remove four screws (1), eight washers (2), and battery box frame (3) with four frame mounts (4) from battery box
brackets (5).
0354 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business