Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-3_454
REMOVAL - TM-9-2350-277-20-3_456
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
366
367
368
369
370
371
372
373
374
375
376
TM 9-2350-277-20-3
REPAIR BATTERY DRAWER (M1064A3 ONLY)
0353 00
THIS WORK PACKAGE COVERS:
Removal (page 0353 00-1).
Cleaning and Inspection (page 0353 00-3).
Installation (page 0353 00-4).
INITIAL SETUP:
Maintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Grease (WP 0928 00, Item 12)
Epoxy coating kit (WP 0928 00, Item 30)
Sodium bicarbonate (WP 0928 00, Item 60)
Locknut (18)
Locknut (8)
Locknut (4)
Locknut (2)
Locknut
P
ersonnel
Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery leads removed (WP 0343 00)
Batteries and retainers removed (WP 0349 00)
REMOVAL
1.
Remove eight locknuts (1), washers (2), screws (3), and battery drawer (4) from two angles (5). Discard locknuts.
2.
Extend two slide assemblies (6) to stops. Remove eight locknuts (7), washers (8), screws (9), and two angles (5) from
slide assemblies. Discard locknuts.
0353 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business