Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-3_164
REMOVAL - TM-9-2350-277-20-3_166
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
112
113
114
115
116
117
118
119
120
121
122
TM 9-2350-277-20-3
REPLACE BILGE PUMP
CIRCUIT BREAKER
S (ALL EXCEPT M981A3)
0275 00
THIS WORK PACKAGE COVERS:
Removal (page 0275 00-1).
Installation (page 0275 00-2).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Locknut (8)
Locknut (4)
Personnel Required
Unit Mechanic
References
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00) or
(WP 0338 00)
Instrument warning light panel removed (WP 0260 00)
REMOVAL
1.
Remove eight screws (1), washers (2), and locknuts (3) from master switch panel (4) and distribution box (5). Remove
master switch panel from distribution box. Discard locknuts.
2.
Disconnect circuit 450 lead (6) and circuit 450A lead (7) from front bilge pump circuit breaker (8).
3.
Disconnect circuit 450B lead (9) and circuit 450C lead (10) from rear bilge pump circuit breaker (11).
0275 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business