TM 9-2350-277-20-3
REPLACE BILGE PUMP CIRCUIT BREAKERS (ALL EXCEPT M981A3) Continued
0275 00
4.
Place master switch panel (10) on distribution box (3). Secure with eight screws (11), washers (12), and new
locknuts (13).
FOLLOW-THROUGH STEPS
1.
Install instrument warning light panel (WP 0260 00).
2.
Connect battery ground strap (WP 0337 00) or (WP 0338 00).
3.
Turn MASTER SWITCH to ON (see your -10).
4.
Turn bilge pump switches to ON to check that bilge pump circuit breaker works properly (see your -10). Bilge pump
lights should come on (see your -10).
5.
Turn all switches to OFF (see your -10).
END OF TASK
0275 00-3/4 blank