TM 9-2350-277-20-3REPAIR DISTRIBUTION BOX (M113A3, M901A3, M1059A3, M1064A3, AND M58 ONLY) —Continued0270 00INSTALLATION1. Install two bilge pump circuit breakers (1) in distribution box (2). Secure with four screws (3) and new locknuts (4).2. Install two blocks (5) in distribution box (2). Secure with four screws (6) and new lockwashers (7).NOTEDo Step 3 for M113A3 carriers with water/ration heater kit installed only.3. Install water/ration heater circuit breaker (8) in distribution box (2). Secure with two screws (9) and new locknuts (10).4. Install distribution box (2) on hull. Secure with five screws (11) and new lockwashers (12).0270 00-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business