Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-3_119
REMOVAL - TM-9-2350-277-20-3_122
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
70
71
72
73
74
75
76
77
78
79
80
TM 9-2350-277-20-3
REPAIR DISTRIBUTION BOX (M113A3, M901A3, M1059A3, M1064A3, AND
M58 ONLY)
0270 00
THIS WORK PACKAGE COVERS:
Removal (page 0270 00-1).
Installation (page 0270 00-5).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Adhesive (WP 0928 00, Item 4)
Gasket
Locknut (2)
Locknut (4)
Lockwasher
Lockwasher (2)
Lockwasher (4)
Lockwasher (5)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00)
Master switch panel assembly removed (WP 0260 00)
REMOVAL
1.
Remove screw (1), lockwasher (2), circuit 27E, 10, and 15 lead (3), and circuit lead 450A (4) from bus bar (5) in
distribution box (6). Remove circuit 27E, 10, and 15 lead (3) and grommet (7) from distribution box. Discard
lockwasher.
0270 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business