TM 9-2350-277-20-2REPLACE DRAIN COCK AND HOSE — Continued 0235 00FOLLOW-THROUGH STEPS1. Fill cooling system (WP 0227 00).2. Install power plant bottom access cover (WP 0450 00).3. Install power plant lower rear access panel (see your -10).END OF TASK0235 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business