TM 9-2350-267-3413-10Change 1PROJECTILE RACK PULL TEST (CONTINUED)TESTABCDEFNOTEInstall projectile rack (1) on test stand (2) using two rods (3),two flat washers (4) and two lockwashers (5).Slippage may occur before full load is applied. ThisPlace projectile (6) in tube (7).should only occur until rotating band encounterslocking shoe. If projectile rotating band goes underDepress and lock two handles (8).locking shoe, test should be considered a failure.Attach line gage (9) to cable (10) using quick-release pin (11).GRemove line gage (9) from projectile (6)HAttach line gage (9) to projectile (6).Remove quick-release pin (11) and remove line gage (9) fromcable (10).Apply 400 lb of pressure, as measured by line gage (9), by turn-Iing winch (12).Raise both handles (8) and remove projectile from tube (7).T A 3 1 2 5 8 7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business