TM 9-2350-267-34PROJECTILE RACK ASSEMBLY: REPAIR-(Continued)ASSEMBLYNOTETo install top locking bars, perform Step B then Step A. To installbottom five locking bars, begin with step A.A Install nine locking bars (19) with nine pins (21) and nine newB Install locking shoe (18) on each locking bar (19) with two screwscotter pins (20).(16) and two new lockwashers (17).1 3 - 5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business