10-2.22Change 4TM 9-2350-267-34WINTERIZATION KIT: INITIAL INSTALLATlON (CONTINUED)CUnfasted two winterization APU front air vent tarpaulin strap assemblies(190). Place strap assemblies inward and roll tarpaulin upward intosmallest possible tube. Secure with webbing and chape assembly.D Unfasten top and side winterization APU side door and roof vent tarpaulinstrap assemblies (191). Place both ends of strap assembly inward and rolltarpaulin downward into smallest tube possible until reaching next set ofstrap assemblies on sides of tarpaulin. Secure with two webbing and chapeassemblies.E Open APU side door assembly and open door assembly on APU plenumassembly. Close APU side door assembly.CAUTIONWinterization kit is not intended for use as a prime source ofheat. Kit operation is intended to commence upon engineshutdown after engine temperatures have reached normaloperating levels. Operation of the winterization kit withengine coolant temperature less than 0°F may result infailure of coolant heater.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business