10-2.20Change 4TM 9-2350-267-34WINTERIZATION KIT: INITIAL INSTALLATION (CONTINUED)DEFGHIPlace cover (177) over door assembly (178). Weld two fasteners.Place strip in tarpaulin cover (177) over top edge of door assembly (178)and transfer drill .2040 3 holes thru; tap. 250-20 UNC-2B thru.Install cover (177) to door assembly (178) using three screws (179) andthree washers (180).Connect cover (177) to air grill door assembly (178) by securing twostrap assemblies (181) to two fasteners.Place APU side door winterization tarpaulin (182) over door assembly(183). Weld eleven fasteners (10930388) and one fastener (12351835).Connect APU side door winterization tarpaulin (182) to door assembly(183) by securing twelve strap assemblies (184) to twelve fasteners.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business