10-2.20
Change 4
TM 9-2350-267-34
WINTERIZATION KIT: INITIAL INSTALLATION (CONTINUED)
D
E
F
G
H
I
Place cover (177) over door assembly (178). Weld two fasteners.
Place strip in tarpaulin cover (177) over top edge of door assembly (178)
and transfer drill .2040 3 holes thru; tap. 250-20 UNC-2B thru.
Install cover (177) to door assembly (178) using three screws (179) and
three washers (180).
Connect cover (177) to air grill door assembly (178) by securing two
strap assemblies (181) to two fasteners.
Place APU side door winterization tarpaulin (182) over door assembly
(183). Weld eleven fasteners (10930388) and one fastener (12351835).
Connect APU side door winterization tarpaulin (182) to door assembly
(183) by securing twelve strap assemblies (184) to twelve fasteners.