10-2
Change 4
WINTERIZATION KIT: INITIAL INSTALLATION (CONTINUED)
TM 9-2350-267-34
D Fold up front batteries winterization box (3) and insert box through rear
batteries access opening (4). Locate box in front access opening (5). Make
certain box bottom cut-outs are alined with battery support mounting
blocks.