10-2Change 4WINTERIZATION KIT: INITIAL INSTALLATION (CONTINUED)TM 9-2350-267-34D Fold up front batteries winterization box (3) and insert box through rearbatteries access opening (4). Locate box in front access opening (5). Makecertain box bottom cut-outs are alined with battery support mountingblocks.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business