TM 9-2350-267-10PROJECTILE RACK OPERATION - ContinuedLoading and Stowing Projectiles1. Unlock rack to be loadedby releasing both handles(1) from locking clips (2).NOTEIf necessary, install extensionhandle over projectile rackhandle to obtain additional lev-erage.2.3.4.5.6.Secure handles in unlocked position by pushing them upward and lockingthem with locking clips (3) on rack above. Handles on top racks can be re-tained by locking clips on stowage boxes.Use conveyor (p 2-148) and stacker (p 2-166) to move each projectile to racktube.CAUTIONDo not force projectiles into tubes. If projectile will notslide Into tube, check to make sure handles are re-tained upward. Damage to locking pad could result ifprojectile Is forced into tube with locking handlesdown.Load each projectile into an unlocked rack tube,As each rack is filled, lock projectiles in it by pushing rack handIes out anddown. Position both rack handles into locking clips,After all projectiles have been loaded and locked into place, pull on each pro-jectile. If any projectile can be pulled out, remove it, relocate it in anothertube, or unload it. Lock rack and notify Organizational Maintenance.2-184
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business