TM 9-2350-267-10PROJECTILE RACK OPERATION - Continued4. Open all three top doors (p 2-133 and 2-134).5. Remove beam (1), trolley assembly (2) and hoist (3) from stowage locations.Assemble beam (1), trolley (2) and hoist (3).WARNINGIf both rack assemblies are to be moves, move right rackassembly first.6. Position beam and trolley assembly above racks to be moved. Lower assem-bly so that support legs of beam engage block (4) and right pin (5) at eitherside of vehicle roof.2-187
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business