TM 9-2350-267-10
PROJECTILE RACK OPERATION - Continued
Unloading Projectiles
1.
2.
NOTE
Before beginning to unload projectiles from racks:
l Vehicle must be on level ground.
l Conveyor must be deployed, positioned and operational
(p2-148).
Stacker must be released from its stowed position (p
2-167).
Unlock only rack to be unloaded by releasing both handles (1) from locking
clips (2).
NOTE
If necessary, install extension handle over projectile rack
handles to obtain additional leverage.
Secure handles in unlocked position by pushing them upward and locking
them with locking clips (3) on rack above. Handles on top racks can be re-
tained by locking clip on stowage boxes.
NOTE
If any projectile sticks, refer to troubleshooting section
p 3-17).
2-185