TM 9-2350-267-10
PROPELLING CHARGE STOWAGE AREAS - Continued
Loading Propelling Charge Canisters
1. Open canister side doors (p 2-132) and/or deploy conveyor (p 2-148).
2. Load propelling charge canisters via conveyor (p 2-158) or canister compart-
ment side doors.
3. Place propelling charge canisters in specified stowage areas (p 2-173).
NOTE
When loading canisters into stowage boxes above projec-
tile racks, push canisters fully toward front of vehicle so that
flange of canisters (1) drops into slots (2) at bottom of box.
This will lock canisters into place.
4. Remove straps from hold-open
hooks and tighten hold-down straps
(3) at each canister stowage area.
2-179