TM 9-2350-261-34
25. Remove plug from hole in battery box.
26. Install grommet (1) in hole in battery box.
27. Thread battery cable (2) through
grommet (1) and into battery box.
28.
29.
30.
31.
Connect cable (2) to battery terminals.
Connect 6B POS lead (3) to positive
terminal. Connect 7B NEG lead (4) to
negative terminal.
Install battery box cover (see your -20).
Install front personnel seat backrest (5) to
sponson brackets with two screws (6) and
new locknuts (7).
Test electrical continuity of chemical alarm
kit circuits (see your -20).
FOLLOW-THROUGH STEPS
1. Raise and lock ramp (see your 10).
2. Stop engine (see your 10).
END OF TASK
23-6