55. Install gasket (1) and plate (2) on driver’s56.bulkhead. Secure with four screws (3),washers (4) and new locknuts (5). Havehelper assist.57.TM 9-2350-261-34 Install connector (6) on plate (2) withjamnut (7).Connect right smoke grenade wiring harnessconnector (6) to connector (8).FOLLOW-THROUGH STEPS 1. Install driver’s level indicator (see your -20).3. Install turret (see TM 9-2350-259-34).2. Install master switch panel (see your -20).4. Close power plant access door (see your -20).END OF TASKChange 16-65
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business