55. Install gasket (1) and plate (2) on drivers
56.
bulkhead. Secure with four screws (3),
washers (4) and new locknuts (5). Have
helper assist.
57.
TM 9-2350-261-34
Install connector (6) on plate (2) with
jamnut (7).
Connect right smoke grenade wiring harness
connector (6) to connector (8).
FOLLOW-THROUGH STEPS
1. Install drivers level indicator (see your -20).
3. Install turret (see TM 9-2350-259-34).
2. Install master switch panel (see your -20).
4. Close power plant access door (see your -20).
END OF TASK
Change 1
6-65