TM 9-2350-261-34
N O T E
Make sure to secure all
clamps loosened during
dure.
36.
37.
Position guards (1 and 2)
38.
wiring harness
removal proce-
39.
over rear section
of wiring harness (3) near fuel tank. Secure
guards with two screws (4), washers (5)
and new locknuts (6).
40.
Take proper amount of slack out of wiring
harness (3) and secure to guard (2) with
three clamps (7), screws (8) and new lock-
41.
nuts (9).
Attach guard (2) to fuel tank and weldnuts
with two screws (10) and new
lockwashers (11).
Attach wiring harness (3) to front of fuel
tank and left bulkhead of carrier using sev-
en clips (12).
Attach wiring harness (3) to bulkhead using
two clamps (13), washers (14), new lock
washers (15), and screws (16).
Secure wiring harness (3) to overhead with
eleven clamps (17), screws (18), new
lockwashers (19) and washers (20).
GO TO NEXT PAGE
6-61