TM 9-2350-261-34
16.
Remove eight nuts (1), washers (2), and
screws (3). Separate master switch panel
assembly (4) from distribution box (5).
16.1. Remove circuit 2A lead (13/19) and circuit
2 lead (16/18) from master switch panel
assembly (see your -20).
NOTE
The distribution boxes shown below are
M113A2 configuration. Your distribution
box may have leads not shown here,
Remove and install those leads as needed
to do steps 17 thru 20 below.
17.
Remove screw (6), lockwasher (7), and
circuit 6 lead (8) from bus bar (9).
Remove circuit 6 lead and grommet (10)
from distribution box (5). Discard grommet
and lockwasher.
18. On 100 amp generator system, remove
screw (11), lockwasher (12), and circuit 3
lead (13) from circuit breaker (14). Remove
circuit 3 lead and grommet (15) from
distribution box (5). Discard grommet and
lockwasher.
19. On 100 amp generator system, remove
circuit 2 lead (16) from master switch panel
assembly (see your -20). Remove circuit 2
lead and grommet (17) from distribution
box (5). Discard grommet.
20. On 200 amp generator system, remove
circuit 2 lead (18) and circuit 2A lead (19)
from master switch panel assembly
(see your -20). Remove circuit 2 lead, circuit
2A lead, and two grommets (20 and 21)
from distribution box (5). Discard grommets.
6-20
Change 4