21.
22.
23.
Install circuit 74A lead (1) and two new
24. Connect circuit lB lead (10) to generator
lockwashers (2) on starter solenoid (3).
field switch (11) on secondary fuel filter.
Secure with nut (4).
Install circuit 6 lead (5) and two new
lockwashers (6) on solenoid (3). Secure with
nut (7).
Connect circuit 34 lead (8) to engine low oil
F O L L O W - T H R O U G H
S T E P S
1.
2.
3.
4.
Connect battery ground lead (see your -20).
5.
Install power plant rear access panel
6.
(see your 20).
Start engine (see your -10). Check that
7.
power plant wiring harness works correctly.
Raise and lock ramp (see your -10).
Stop/shutdown engine (see your -10).
Close power plant front access door and raise
trim vane (see your 10).
Install hull bottom access cover
(see your 20).
END OF TASK
6-17
T M 9 - 2 3 5 0 - 2 6 1 - 3 4
P R E S S U R E
S W I T C H
( 9 )