TM 9-2350-261-20-4
REPLACE POWER DISTRIBUTION CABLE (W3) (M1068 ONLY) -- Continued
0739 00
INSTALLATION
1.
Install new W3 cable (1) in carrier.
2.
Connect cable W3 plug P1 (1) to jack J1 (2) on power distribution box A3 (3).
3.
Install four clamps (4) on cable W3 and secure to hull weldnuts with screws (5).
4.
Install six new tie straps (6) on cable W3.
5.
Connect cable W3 plug P3 (7) to jack J24 (8) on power distribution enclosure A1 (9).
FOLLOW-THROUGH STEPS
Connect battery ground lead (WP 0294 00).
1.
Turn MASTER SWITCH to ON (see your -10). Check that electrical system works properly. See TM
2.
11-7010-256-12&P.
Turn MASTER SWITCH to OFF (see your -10).
3.
END OF TASK