TM 9-2350-261-20-4
REPLACE LAN GROUND BOX ASSEMBLY A15 (M1068 ONLY)
THIS WORK PACKAGE COVERS:
INITIAL SETUP:
Equipment Condition
Maintenance Level
Engine stopped (see your -10)
Unit
Carrier blocked (see your -10)
Tools and Special Tools
All external power disconnected (TM 11-7010-256-
12&P)
Battery ground lead disconnected (WP 0294 00)
Personnel Required
Signal Support System Specialist 31U10
REMOVAL
1.
Disconnect cable W40 (1) from connector J1 (2) on LAN ground box (3).
2.
Remove two screws (4), washers (5), and LAN ground box (3) from work station rack base (6).