TM9-2350-261-20-215.16.17.Connect differential high oil temperatureswitch lead (1) to main wiring harness.Connect two pivot steer hydraulic hoses totwo quick disconnect couplings (2).Install fuel shutoff cable (3) on bracket (4).Secure with clamp (5), new locknut (6), andscrew (7) .F O L L O W - T H R O U G H S T E P S1.2.3.4.5.6.7.8.9.Install differential steering brake levers(page 23-20).Connect differential oil cooler hose(page 21-14).Connect differential oil pump hose(page 21-10).Fill differential with oil (see your LO).Install right final drive shaft (page 20-7).Install left final drive shaft (page 20-5).Install differential brake linkage(page 23-19).Install transmission to differential shaft(page 20-2).Install deaeration elbow (page 8-15).10.11.12.13.14.15.16.17.18.19.Install exhaust pipe (page 7-16).Install radiator outlet coolant tube(page 8-14).Fill cooling system (page 8-5).Install air cleaner housing (page 7-7).Connect fuel shutoff cable to engineadjust cable (page 23-44).Close power plant front access door(see your -10).Raise trim vane (see your -10).Connect battery ground cable (pageand13-2).Operate carrier (see your -10). Check thatdifferential is operable.Engine stopped/shutdown (see your -10).END OF TASK21-22Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business