TM 9-2350-261-20-2 REPLACE TRANSMISSION TO OIL COOLER HOSE AND F I T T I N G SDESCRIPTIONThis task covers:Remove (page 18-2).Clean, Inspect, and Replace (page 18-3).Install (page 18-3).INITIAL SETUP Tools:General Mechanics Tool Kit (Item 30, App D)Adjustable Wrench (Item 80, App D)Pipe Wrench (Item 86, App D)Materials/Parts:Dry cleaning solvent (Item 13, App C)Sealing compound (Item 51, App C)Key washer (2)Preformed packingSelf-locking nutSuitable containerPersonnel Required:Unit MechanicReferences:See your –10See your LOEquipment Conditions:Power plant removed (page 5-11)REMOVE1.2.3.4.5.6.7.8.9.10.Remove screw (1), key washer (2), twoclamps (3), and two hoses (4 and 5) fromtransmission (6). Discard key washer.Remove screw (7), locknut (8), clamp (9),and two hoses (4 and 5) from bracket (10).Discard locknut.Disconnect hose (4) from elbow (11). Placehose through hull access opening. Drain oilfrom cooler and hose into container.Discomect hose (4) from elbow (12).Remove elbow (12) from tee (13).Disconnect circuit 327 lead (14) from trans-mission high oil temperature switchRemove switch (15) from tee (13).Remove tee (13) from bushing (16).Remove bushing (16) from oil coolerUse pipe wrench.(15).(17).Remove elbow (11) from transmission(6).11. Remove preformed packing (18) fromelbow (11). Discard packing.18-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business