TM 9-2350-261-20-2CLEAN, INSPECT, AND REPLACE10.5.6.7.Check leads. Replace frayed, cracked, orbroken leads (page 14-3).11.Check connectors. Replace cracked or brokenconnectors (page 14-3).12.Inspect gasket on flange of distribution box.Replace if damaged.INSTALL8.9.Place circuit breakerbox (2). Secure withnuts (4).Place circuit breaker(2). Secure with two(1) in distributiontwo screws (3) and(5) in distribution boxscrews (3) and nuts (4).Connect circuit 10 lead (6) and circuit 37Alead (7) to circuit breaker (1).Connect circuit 37B lead (8) and circuit 10lead (9) to circuit breaker (5).Place panel (10) on distribution box (2).Secure with eight screws (11), washers (12),and new locknuts (13).FOLLOW-THROUGH STEPS 1. Connect battery ground lead (page 13-2).3. Turn MASTER SWITCH OFF (see your -10).2. Turn MASTER SWITCH ON. Check forpower at utility outlet receptacles(page 3-122).END OF TASK17-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business