37.
38.
39.
40.
41.
Secure two bulkhead elbows (1) to power
plant rear bulkhead with two nuts (2).
Connect two tube assemblies (3) to two
elbows (1).
Connect two elbows (4) to two tubes (3).
Install two quick-disconnect coupling halves
(5) on two elbows (4).
Connect fuel supply hose (6) and fuel return
42.
43.
44.
45.
Secure two fuel hoses (6 and 7) together
with five straps (8).
Install two hoses (6 and 7) on four weldnuts
(9). Secure with four screws (10) and eight
clamps (11).
Secure two guards (12) to hull with five
screws (13) and washers (14).
Connect two quick-disconnect couplings (15)
inside power plant rear bulkhead.
Fill fuel tank (see your -10).
hose (7) to two elbows (1).
46.
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Install rear compartment floor plates
(page 24-37, 24-42, or 24-45).
2. Start engine (see your -10). Check for leaks.
5. Raise and lock ramp (see your -10).
3. Install power plant rear access panel
(page 24-27).
6. Stop/shutdown engine (see your -10).
END OF TASK
6-26
TM 9-2350-261-20-1
