TM 9-2350-261-20-1S M O K E G R E N A D E L A U N C H E R ( S ) M A L F U N C T I O NINITIAL SETUP Tools:General Mechanics Tool Kit (Item 30, App D)Digital Multimeter (Item 43, App D)Personnel Required:Unit MechanicHelper (H)Inferencessee your -10Equipment Conditions:Engine stopped/shutdown (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant front access door open(see your -10)Harness 12313235 removed from launcherarming/firing unit1. Does either launcher operate properly?GO TO PAGE 3-199I1.2.3.4.5.Remove harness launcher plug (1) from failinglauncher.Remove harness circuit 7 (2) and 799 (3) plugsfrom harness (right launcher) or harness (leftlauncher) jacks (4).Measure resistance between harness launcher plug(1) pin A (5) and circuit 7 plug (2).Measure resistance between harness launcher plug(1) pin C (6) and circuit 799 plug (3).Does multimeter read 0 ohms for both measure-ments?1. Replace harness for left orright grenade launcher(page 27-3).2. Verify no faults found.3-196
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business