TM 9-2350-261-10C A R R I E R D I P C H E C KI N I T I A L S E T U PPersonnel Required:Equipment Conditions:DriverPower control enclosure turned offCrew(M1068 Only)(TM 11-7010-256-12&P)References:TM11-7010-256-12&PWARNINGCarrier can sinkand personnel candrown if dip (trialwater operation)exercise isnotconducted prior toactualwateroperationinstreams or rivers with personnelaboard.Carrier can sinkduring water op-erationswhentrim vane is notextendedandlocked in place.Personnel can be killed. Extendand lock trim vane in wateroperations position before enter-ing water.NOTEA p l y w o o d t r i m v a n e w i thbolt-on buoyancy pods is re-quired on M113A2 and M1059carriers before attempting wa-ter operations. A plywood trimvane is required on the M577A2and M1068 before attemptingwater operations. If not in-stalled, notify unit maintenance.Conduct dip exercise in calmwaters with the actual wateroperation payload.1.2.3.4.5.Perform PREPARATIONBEFORE WATER OPERATION,steps 1 thru 33 (page 2-275)before entering water.Practice emergency exitprocedures with personnel ridingin carrier before entering thewater.Attach one or more marker buoysto earner.Attach a recovery carrier winchcable to carrier towing eyes. Playout winch as carrier enters thewater.Turn both BILGE PUMPS ON.GO TO NEXT PAGEChange 32-287
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business