TM 9-2350-247-20-2
REPLACE STARTER RELAY (M548A3) -- Continued
0255 00
INSTALLATION
1.
Align starter relay (5) on generator mounting bracket (22). Secure with two screws (21), washers (20), and new
locknuts (19).
2.
Install lead 3 (21), new lock washer (16), and nut (15) on terminal (18).
3.
Install lead 1 (17), new lock washer (11), and nut (12) on terminal (14).
4.
Install circuit 74A lead (9), new lock washer (8), and nut (7) on terminal (10).
5.
Install lead 2 (3), new lock washer (2), and nut (1) on terminal (4).
6.
If ground leads have been removed, install new strap (6) around ground lead (13), ground lead (17), and ground lead (3).
FOLLOW-THROUGH STEPS
1.
Install power plant rear access panel (see your -10).
2.
END OF TASK