TM 9-2350-247-20-1REMOVE/INSTALL POWER PLANT (M548A1) — Continued 0130 00INSPECTION-ACCEPTANCE AND REJECTION CRITERIACAUTIONSteam clean power plant only. Do not use cleaner or solvent which could damage rubber andplastic.1. It tactical situation permits, steam clean power plant compartment. Make sure it is ready to receive power plant.INSTALLATIONWARNINGMake sure lifting device has rated lift capacity of at least 2500 lb (1135 kg) to safely raise thepower plant. Keep all parts of body from under the suspended load.1. (H) Attach beam type sling (1) to lifting device. Slowly raise power plant and lower it into power plant compartment.Keep slight tension on sling.0130 00-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business