TM 9-2350-247-20-1REMOVE/INSTALL POWER PLANT (M548A1) — Continued 0130 0017. Remove fuel cutoff cable from power plant.a. Loosen two setscrews (1) that secure control cable (2) in two collars (3) and stop lever (4).b. Remove two screws (5) and lock nuts (6) that secure control cable (2) in clamp (7). Remove cable from powerplant. Discard lock nuts.0130 00-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business