• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STACKER - Continued
VENTILATED  FACE  PIECE  SYSTEM  -  Continued

TM-9-2350-267-10 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
  282    283    284    285    286  287  288    289    290    291    292  
TROUBLESHOOTING - Continued TM  9-2350-267-10 MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION 32. 33. 34. 35. PROJECTILE   RACKS PROJECTILE DOES NOT GO INTO RACK TUBE Step 1. Check inner diameter of tube for obstruction or damage. Remove obstruction if possible. Notify Organizational Maintenance if tube is damaged. Step 2. Check locking shoe for locked position. Open  locking  handles. PROJECTILE(S) ARE NOT HELD IMMOBILE IN TUBE Step 1. Step 2. Check that handles are in locked position. Place handles in locked position. Check for defective lock. If damaged, notify Organizational Maintenance. PROJECTILES  WILL  NOT  COME  OUT  OF  TUBE(S) Step 1. Make sure rack is unlocked and handles are positioned up (released). Step 2. Remove projectiles by pulling on nose plug with cargo hook. Notify  Organizational  Maintenance. VENTILATED FACE PIECE SYSTEM REDUCED OR NO AIR FLOW TO VENTILATED FACE PIECE Step 1. Check vehicle MASTER switch. Turn  MASTER  switch  ON. 3-17







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.