| |
TM 9-2350-287-20-2
11-5. ROADWHEEL HUB REPLACEMENT.
This Task Covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
Initial Setup:
Tools/Test Equipment:
l Bearing cup replacer (inner) (Item 7, Appendix I)
l Bearing cup replacer (outer) (Item 8, Appendix I)
l General mechanics tool kit (Item 24, Appendix I)
l Manual control handle (Item 34, Appendix I)
Torque wrench, 0-175 ft-lb (Item 69, Appendix I)
Materials/Parts:
l Drycleaning solvent (Item 28, Appendix D)
Grease (item 33, Appendix D)
l Rag (item 56, Appendix D)
Cotter pin (Item 15, Appendix H)
Preformed packing (Item 230, Appendix H)
l Seal (Item 298, Appendix H)
References:
l TM 9-214
Equipment Conditions:
l Vehicle parked on level ground
(refer to TM 9-2350-287-10).
l Roadwheels removed (para 11-4).
a.
REMOVAL
NOTE
This procedure applies to roadwheel arms 1 through 7. Position 2 is shown.
1.
Remove grease fitting (4) from cap (3).
2. Remove relief valvew (1) from roafwheel hub (2).
11-11
|