| |
TM 9-2350-287-20-2
17-11. CONVEYOR CENTER SECTION ASSEMBLY REPLACEMENT (continued).
3.
4.
5.
6.
b.
1.
2.
3.
4.
5.
6.
7.
Remove center section (4) from conveyor assembly (10).
Remove 10 screws (11) from two side wear strips (12). Pry up and remove two side wear strips (1 2) from center
section (4).
Remove four screws (16) and chain-return wear strip (15) from center section (4).
Remove six screws (14) and bottom wear strip (13) from center section (4).
INSTALLATION
Install bottom wear strip (13) on center section (4) with six screws (14).
Install chain-return wear strip (15) on center section (4) with four screws (16).
Apply sealing compound to threads of 10 screws(11).
Install two side wear strips (12) on center section (4) with 10 screws (11).
Install center section (4) on conveyor assembly (10) and support with blocks or support stands.
Install two hooks (2) through two tube assemblies (3), and lower two toggle clamps (1) to cause tension on
tube assemblies (3).
Install 12 screws (5), washers (7), new Iockwashers (8), and nuts (9) in two hinge halves (6).
FOLLOW-ON MAINTENANCE:
l Install conveyor assembly (para 17-6).
l Install conveyor chain assembly (para 17-17).
17-27
|