| |
TM 9-2350-287-20-2
15-69. LEFT DUFFLE BAG STOWAGE REPLACEMENT (continued).
2.
Peen ends of each of four connecting link pins (13).
3.
Install bar assembly (6) on hull with three screws (8) and new Iockwashers (7).
4.
Install bar assembly (4) on hull with three screws (2) and new Iockwashers (3).
50
With the aid of an assistant, install shelf assembly (9) on bar assembly (6) with three pins (1 O) and new cotter
pins (11).
6.
Fold up shelf assembly (9). Install eight duffle bag stowage eyelets (5) with 16 screws (15) and new
Iockwashers (16).
7.
Install net (1) and hook onto eight duffle bag stowage eyelets (5) and two bar assemblies (4 and 6).
15-179
|