TM 9-2350-287-20-1TABLE 2-1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR M992A1S= SEMIANNUAL A= ANNUALITEM INTERVALITEM TO BEPROCEDURENOT FULLY MISSIONNO.INSPECTEDCAPABLE IF17ACOOLING SYSTEMa. Remove and clean cooling systema. Any missing screws orPRESSURE RELIEFpressure relief valve as follows:broken or missing valveVALVEparts, or any coolant leaks.(1) Unscrew nut (22) and remove hose(21) from lower end of relief valve (23).(3) Wipe off accumulation of rust fromrelief valve (23). Depress spring tomake sure relief valve (23) is notbroken.(4) 'Position relief valve (23) in placeand install four screws (24).(5) Install hose (21) on lower end ofrelief valve (23) and tighten nut (22).18ACOOLANTTest radiator coolant for propera. Coolant does not passprotection (refer to TB 750-651).alkalinity test in TB 750-651.Not protected to -200F.a. Check coolant system for leakage.b. Check coolant level (refer toTM 9-2350-287-10).19AEXHAUST DUCTSCheck all components. Replace anyAny damaged component,damaged components. Check allloose clamps, or exhaustclamps (25) and mount bolts (26).leaks.2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business