TM 8-2350-287-20-1
9-4. FINAL DRIVE ASSEMBLY REPLACEMENT (continued).
8.
Install two screws (8) and new Iockwashers (9) in final drive assembly (4). Torque screws (8) to 290 ft-lb (393
9.
10.
Nm).
Install drain plug (7) in final drive assembly (4).
Fill final drive assembly (4) with oil (refer to Appendix G).
11.
Position vent tube (6) in vehicle and tighten vent tube hexnut connector (5).
12.
Secure upper end of vent tube (5) in final drive assembly (4) with clamp (3), screw (1), and new Iockwasher
(2).
FOLLOW ON MAINTENANCE:
l Install final drive sprocket and hub (para 11-11)
l Install universal joint and flange (para 9-3).
9-12