TM 9-2350-277-34
INSTALL PERSONNEL HEATER KIT (M1064A3 ONLY) Continued
0073 00
43. Secure elbow (1) to power plant bulkhead with locknut (2).
44. Secure tube (3) to elbow (1) and elbow (4) with two sleeves (5) and nuts (6).
45. Secure tube (3) to weldnut (7) with clamp (8) and screw (9).
46. Install nipple (10) in personnel heater (11).
47. Install elbow (12) on nipple (10).
48. Secure reducer (13) to elbow (1) with sleeve (14) and nut (15).
49. Secure fuel hose (16) to reducer (13) and elbow (12) with two sleeves (17) and nuts (18).
0073 00-7