TM 9-2350-277-34
REPLACE FRONT MAIN WIRING HARNESS Continued
0030 00
58. Install panel (5) with two mounts (13) on support (12). Secure with two screws (8) and new lockwashers (9).
59. Install panel (12) on two struts (13) and (14). Secure with two nuts (15), mounts (16), washers (17), and screws (18).
FOLLOW-THROUGH STEPS
1.
Connect battery ground strap (see your -20)
2.
Close power plant front access door (see your -10)
3.
Raise power plant access cover (see your -10)
4.
Raise trim vane (see your -10)
5.
Start engine (see your -10)
6.
Check that master switch panel, instrument panel, distribution box, and lights work right (see your -10)
7.
Stop engine (see your -10)
8.
Turn MASTER SWITCH to OFF (see your -10)
END OF TASK
0030 00-36