Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-6_502
REPAIR CHEMICAL ALARM JUNCTION BOX (M113A3 ONLY)
TM-9-2350-277-20-6 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
396
397
398
399
400
401
402
403
404
405
406
TM 9-2350-277-20-6
REPLACE
CHEMICAL ALARM
JUNCTION BOX/POWER CABLE/ALARM CABLE
(M113A3 ONLY) — Continued
0919 00
10. Install two screws (35), washers (36), and clamps (37) with cable (1) and wiring harness (22) on hull.
FOLLOW-THROUGH STEPS
1.
Connect battery ground strap (WP 0919 00).
END OF TASK
0919 00-9/10 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business