TM 9-2350-277-20-5REPLACE FOG OIL PUMP ELECTRICAL CABLE ASSEMBLY — Continued 0759 00INSTALLATION1. Align cable assembly (1) on hull with clamps (2)(3) and three clamps (4). Secure with new lockwashers (5) andscrews (6).2. Connect cable assembly (1) to control panel assembly connector 1J5 (8).3. Connect cable assembly (1) to fog oil pump cable assembly (7).FOLLOW-THROUGH STEPS1. Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00).2. Set circuit breaker CB1 to ON (TM 3-1040-283-10).END OF TASK0759 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business