TM 9-2350-277-20-5
INITIAL INSTALLATION OF LITTER KIT (M113A3 ONLY) Continued
0741 00
6.
Suspend four chain assemblies (1) by installing four hangers (2) in hull ceiling.
7.
Attach four hooks (3) to four anchors (4) below floor plates by extending four springs (5). Use hand or foot to extend
springs.
8.
Connect two chains (6) on each side with two S-hooks (7). Keep these chains tight to prevent movement of litter from
front to rear.
FOLLOW-THROUGH STEPS
1.
Install commanders seat and post (WP 0560 00).
2.
Start engine (see your -10).
3.
Raise and lock ramp (see your -10).
4.
Stop engine (see your -10).
5.
Return spall liners to stock or store for future use.
END OF TASK
0741 00-3/4 blank