TM 9-2350-277-20-5
INITIAL INSTALLATION OF LITTER KIT (M113A3 ONLY)
0741 00
THIS WORK PACKAGE COVERS:
Installation (page 0741 00-1).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Commanders seat and post removed (WP 0560 00)
Personnel seats removed (WP 0546 00)
Right spall liners removed (WP 0504 00)
Left spall liners removed (WP 0505 00)
INSTALLATION
WARNING
Remove machine gun and all ammunition when operating M113A3 as a litter carrier. Display
red cross symbol on exterior of carrier.
NOTE
Spall liners and personnel seats must be returned to stock or stored for future use.
All four posts and chain assemblies are installed in the same way.
1.
Install upper post pin (1) and lockwasher (2) into hull ceiling.
0741 00-1